Kitchens, with the wiring designed in.

A kitchen is the one room where the electrical decides the layout. We hold both licenses, so the circuits are planned with the cabinets rather than chased in afterwards.

Completed kitchen renovation

Why the two trades belong together.

Most homes were not built for what a kitchen now has to carry. Induction ranges, double ovens, a dishwasher, a disposal, a microwave, a run of small appliances along the counter and lighting under every cabinet — that is far more load, and far more circuits, than the original design allowed for.

Hiring a kitchen contractor and then an electrician means the electrical gets planned around cabinets that are already fixed. Outlets end up where a splashback wants to be, and a circuit that should have been run while the wall was open becomes a chase through finished plaster.

We plan the two together. The rough-in happens while the walls are open, which is the cheapest it will ever be, and every socket and switch lands where the finished kitchen actually needs it — from demolition through to the last switch plate.

What the package covers.

Kitchen remodeling

  • Custom cabinetry, designed and installed
  • Countertops in quartz, granite or your choice of surface
  • Backsplash tile work
  • Flooring installation
  • Appliance installation and coordination
  • Sink and faucet updates
  • Paint and finishing

Electrical

  • Smart switches with dimming
  • USB outlets through the kitchen
  • Under-cabinet LED lighting
  • Dedicated 240V circuits for major appliances
  • GFCI protection everywhere code requires it
  • Panel upgrade if the service will not carry the load
  • Smart-home integration, Alexa and Google Home compatible

What one contractor actually changes.

It costs less

One mobilisation instead of two, less wasted material, and bulk purchasing passed on. Customers typically save 15–25% against hiring the trades separately.

It finishes sooner

Nobody waits for another company's calendar. With the trades under one schedule, projects typically run 30–40% faster than the sequential approach.

There is one number to call

No finger-pointing between contractors. You talk to one project manager, and problems get solved instead of allocated.

The details line up

Outlets, switches and lighting are placed against the real cabinet and appliance layout, because the same people are drawing both.

One company stands behind it

Remodeling and electrical are both ours. If something needs adjusting afterwards we deal with it, without a dispute about whose work it was.

It is ready for what comes next

Sensible circuit planning and smart switches now mean the next addition does not require opening the walls again.

How a kitchen runs.

01Design consultation — layout, materials, electrical requirements2–3 weeks
02Detailed plans, permits and material ordering1–2 weeks
03Demolition and electrical rough-in while walls are open3–5 days
04Construction, cabinetry, surfaces and flooring2–3 weeks
05Electrical finish, smart-home setup and testing2–3 days
Typical total6–8 weeks

Kitchens we have finished.

Kitchen with island and range
Open-plan kitchen renovation
Galley kitchen renovation

Ready to transform your kitchen?

Register and your project appears in your portal. Upload photos of the kitchen as it stands, and we will come and look, free, before putting a real price to it.